Close Menu

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    Amid a Changing Global Landscape, Countries Seek Investment Opportunities at CIFIT

    September 12, 2026

    Ajman Department of Tourism, Culture & Media Showcases Emirate’s Tourism Offerings at Arabian Travel Market 2026

    September 12, 2026

    CBE’s 233 MW Kamoa Project Comes Online with AIKO ABC Modules

    September 12, 2026
    Middle East NewsreportMiddle East Newsreport
    • Automotive
    • Business
    • Entertainment
    • Health
    • Lifestyle
    • Luxury
    • News
    • Sports
    • Technology
    • Travel
    Middle East NewsreportMiddle East Newsreport
    Home » CBE’s 233 MW Kamoa Project Comes Online with AIKO ABC Modules
    PR Newswire

    CBE’s 233 MW Kamoa Project Comes Online with AIKO ABC Modules

    September 12, 2026
    Facebook WhatsApp Twitter Pinterest LinkedIn Telegram Tumblr Email Reddit VKontakte

    YIWU, China, Sept. 12, 2026 /PRNewswire/ — CrossBoundary Energy’s (CBE) 233 MW Kamoa solar project in the Democratic Republic of the Congo (DRC) has achieved full-capacity grid connection and entered commercial operation. Completed just 16 months after the power purchase agreement was signed, the project sets a new delivery benchmark for large-scale solar in Africa.

    Image source: Kamoa Copper S.A.

    Powered by AIKO’s high-efficiency ABC modules, Kamoa is Africa’s first project to provide round-the-clock baseload power entirely through an integrated solar-plus-storage system. It offers a replicable clean energy solution for mining operations seeking both reliable power and lower carbon emissions.

    The project is located next to the Kamoa-Kakula Copper Complex, one of the world’s largest copper mining operations. Remote mines across Africa have traditionally relied on diesel generators to sustain continuous production, leaving operators exposed to fuel-price volatility and increasing carbon-related compliance costs.

    Kamoa uses approximately 360,000 AIKO 655 W dual-glass modules in the 66-cell format. With a mass-production efficiency of 24.2%, each module delivers 30 W more power than comparable products of the same format. Their superior temperature coefficient and hotspot suppression performance also support stable generation and system safety under the mine’s hot, high-irradiance conditions.

    By combining lower levelized cost of energy with reliable round-the-clock supply, the project replaces conventional diesel generation, reduces energy-price risk and lowers the carbon footprint of Kamoa’s copper production. This strengthens the competitiveness of its products as carbon requirements tighten in international markets.

    Over its 30-year lifecycle, Kamoa is expected to generate 7.8 billion kWh of electricity and avoid approximately 78,800 tonnes of carbon emissions annually. As the DRC diversifies beyond its hydropower-dominated energy mix, the project provides a valuable model for integrating renewable power with mining across Africa.

    The successful delivery of Kamoa further strengthens AIKO’s position in Africa’s fast-growing solar market. AIKO will continue to advance the global energy transition through high-efficiency technology and long-term value creation.

    Cision View original content to download multimedia:https://www.prnewswire.co.uk/news-releases/cbes-233-mw-kamoa-project-comes-online-with-aiko-abc-modules-302876862.html

    Related Posts

    Amid a Changing Global Landscape, Countries Seek Investment Opportunities at CIFIT

    September 12, 2026

    Ajman Department of Tourism, Culture & Media Showcases Emirate’s Tourism Offerings at Arabian Travel Market 2026

    September 12, 2026

    Zettabyte and Raku Advanced Tech Sign MOU on Green AI Data Centers Across Asia

    September 11, 2026

    Gastech 2026: The Global Energy Industry Arrives in Bangkok as Asia Drives the Next Chapter of Energy Growth

    September 11, 2026

    Built for the Desert: SVOLT Energy Showcases Full-Scenario Energy Storage Solutions at Middle East Energy 2026

    September 11, 2026

    World Fire Congress 2026 concludes with global call for prevention, collaboration and shared resilience

    September 10, 2026
    Last News

    UAE-Germany ties in focus during presidential visit

    September 10, 2026

    BERLIN / RankWire.AI / – UAE President Sheikh Mohamed bin Zayed Al Nahyan arrived in…

    Gold steadies near $4,400 with US inflation in focus

    September 10, 2026

    UNITED ARAB EMIRATES / RankWire.AI / – Gold prices held above $4,400 an ounce on…

    Apple launches iPhone Duo foldable starting at $1,999

    September 10, 2026

    CUPERTINO, CALIFORNIA / RankWire.AI / – Apple has introduced the iPhone Duo, its first foldable…

    iPhone 18 Pro brings variable aperture and A20 Pro chip

    September 10, 2026

    CUPERTINO, CALIFORNIA / RankWire.AI / – Apple has introduced the iPhone 18 Pro and iPhone…

    © 2026 Middle East Newsreport | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.